Production Project Department divides into two teams: Electrons Production Project Team and Silicone Production Project Team. It has more than 30 experienced production technical professionals including 12 Engineer PE, 4 Engineer IE, 4 Engineer ME, 5 Model Technicians and 8 Test Clamp Technicians. |
|
| The department has a number of advanced equipment and instrument including: 2 microcomputer numerical control mill drilling machines, 5 single-phase bench drills, 5 numerical control barometric pressure machines, 2 TEKTRONIX Corporation’s TDS1002 numeral storage oscilloscops, 10 FLUKE Corporation's digital multitesters, etc. |
 |
|
 |
|
With the outstanding specialized production technical team, reasonable labor division, and the advanced equipment, the production ability and quality are guaranteed. |
|
| |
|
 |
|
|